Version 5.0.3

  • Fixed an issue with the ability to select the end time of the End Date field on a Schedule. This issue was introduced in GoAnywhere MFT 5.0.
  • Fixed an issue on the Project Debug page where the Job Log link wasn't working properly.
  • Fixed an issue on the AS2 configuration page where cancelling out of the SSL Certificate alias would remove a previously specified the AS2 signature alias.
  • Fixed the license validation check when starting up a connection to the Gateway server.
  • Removed redundant license validation checks that were called each time project was executed.