Version 5.2.2

  • Enhanced the FTP server to support localized character encoding.
  • Added support for diffie-hellman-group-exchange-sha256 key exchange algorithm.
  • Added the ability to add file activity to the File Audit Log from Custom Tasks.
  • Updated the login validation to allow admin users with Security Officer or Project Administrator roles to log in even when configured to have no domain access.
  • Added missing Web Help links to the WebDAV Resource pages.
  • Fixed an issue where copying a Project across domains would delete the source Project instead of the target Project when overwriting an existing Project in the target Domain.
  • Fixed the auditing of GoFast transfers to log a failure in the event that a data connection could not be established.
  • Fixed the interrupting of the GoFast file read worker to no longer report a failure when the worker is shut down.
  • Fixed an issue with the validation of WebDocs and Workspace directories that could cause a clustered environment to fail on startup if more than one domain shares either of these directories.
  • Fixed the UI styling of the Secure Folder, Secure Mail, and GoDrive upload dialog that was negatively affected by the Primefaces upgrade in 5.2.
  • Fixed an issue that could cause the selected page size for audit log tables to be ignored, resulting in the page loading all audit results matching the filter criteria.
  • Fixed a permission check with viewing and managing queued and active jobs from the UI and GACMD with a user that is a Project Executor and not a Job Manager.
  • Fixed the audit log for GoFast uploads and downloads to show the correct time taken for transfers.
  • Fixed a resource leak with Basic LDAP/Active Directory login methods that weren't properly closing resources when connectivity was lost.